Page added on April 22, 2008
Hamstrung by unpredictable climatic changes that have reduced the water levels in Lake Victoria and the amount of hydroelectricity generated by dams along the River Nile, the Ugandan government is turning to the more predictable nuclear power.
The country’s Energy and Mineral Development Minister, Daudi Migereko, estimates that Uganda will be in a position to generate nuclear energy from its uranium deposits within the next 10 to 15 years.
Said Mr Migereko: “With the ever increasing demand, it is envisaged that nuclear power will play an increasing role in the future energy supply. Uganda has significant uranium reserves that can be exploited and used for power generation.”
The Ugandan government has been battling a power crisis since the late 1990s caused by a combination of low investment in the energy sector and low hydropower generation caused by falling water levels in Lake Victoria, which feeds the country’s two hydropower dams in Jinja on the Nile.
Power output at the hydropower complex in Jinja has fallen from an installed capacity of 380 Megawatts to around 135MW, forcing the country to resort to diesel-guzzling emergency thermal power plants that produce 100MW.
Leave a Reply