Page added on January 25, 2008
LONDON, Jan 25 (Reuters) – Nigerian crude oil shipments are expected to tumble sharply in March because of maintenance work at the Bonga field and a force majeure at the Forcados terminal, traders said on Friday.
The March loading schedule is estimated at around 1.72 million barrels per day, down 420,000 bpd from the previous month.
Royal Dutch Shell’s
The loading programme shows only three 950,000 barrel cargoes in March, down from eight stems the previous month.
Leave a Reply