Warning: Undefined array key "HTTP_CF_IPCOUNTRY" in /var/www/peakoil.com/public_html/wp-content/themes/thebeeb/header.php on line 16
Gazprom ups pipeline costs, delays oil project  |  Peak Oil News and Message Boards




Register

Peak Oil is You


Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 239

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 239

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 174

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 174

Donate Bitcoins ;-) or Paypal :-)


Page added on March 31, 2008

Bookmark and Share

Gazprom ups pipeline costs, delays oil project


Warning: Undefined variable $result in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 89

Warning: Undefined variable $result in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 89

Warning: Undefined variable $result in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 89

Warning: Undefined variable $result in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 89

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 239

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 239

Warning: Trying to access array offset on false in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 137

Warning: Trying to access array offset on false in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 138

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 174

Warning: A non-numeric value encountered in /var/www/peakoil.com/public_html/wp-content/plugins/random-image-widget/random_image.php on line 174

MOSCOW (Reuters) – Russia’s gas export monopoly Gazprom acknowledged on Monday it was facing delays and cost overruns at two key projects, a pipeline to Europe and an Arctic oil development.


The world’s largest gas firm said in a memorandum for investors ahead of its Eurobond issue that its Nord Stream pipeline to Germany under the Baltic Sea would cost 7.4 billion euros ($11.7 billion), up from the previous estimate of 5 billion euros.


Germany’s former chancellor and chairman of the Nord Stream consortium, Gerhard Schroeder, has said it may cost over 8 billion euros to build the pipeline, which will ultimately ship 55 billion cubic metres of Russian gas to Europe via two links.


But the consortium, which also includes Germany’s BASF and E.ON, as well as Dutch Gasunie, has so far declined to confirm the figure, saying it was awaiting a final valuation.


Reuters



Leave a Reply

Your email address will not be published. Required fields are marked *