by kublikhan » Wed 08 May 2019, 05:01:56
If you want to say fast breeder reactors are the solution to the nuclear waste problem I'm not sure using Russia is a very good example. Not when they've been taking nuclear waste from Beloyarsk and dumping it in a nearby swamp.
$this->bbcode_second_pass_quote('', 'R')ussia's laws prohibit dumping of liquid radioactive waste in the open hydrographic network. Despite this, it takes place at the Beloyarsk NPP over many years. During the operation of the plant’s three units, radionuclides have been accumulated in sediments of the Olkhovsky wetland (the BNPP water dump site) and removed by the Pyshma river to 180 km downstream. In fact, the Olkhovsky wetland and the Olkhovka river have turned into an illegal dump-site of radioactive waste and become a secondary source of pollution. More than 100 Ku of long-lived radionuclides have been dumped to the Olkhovsky wetland. According to the Institute of Geophysics, in terms radionuclides content, muddy bottoms of the Olkhovka river are close to the category of radioactive waste - the concentration of radionuclides in them is more than 30 kBq / kg. Increased level of activity has led to the need for closure of the wetland area (about 40 ha). Independent studies carried out by the Radiation Safety Committee found multiple exceeding of cesium-134 and cesium-137 content in the water.
In addition, heavy hydrogen - tritium - emerged in result of the first two blocks operation. In water of the Beloyarsk Reservoir concentration of tritium 2-3 times exceeds natural background. According to the Institute of Geophysics, "tritium is found in the Elizavetisky underground water intake from which drinking water is taken to Yekaterinburg”. Meanwhile, the existing system of radioactive monitoring does not take into consideration impact of tritium, radon and carbon-14.
Russia's fast breeder reactor program doesn't exactly have a stellar safety record either. Because of all of the accidents and radiation leaks the safety zone around the plant has grown to the size of Chernobyl.
$this->bbcode_second_pass_quote('', 'O')ne of the serious problems of the BN-600 operation is a possible leak of sodium. There were 27 leaks at the unit, five of them occurred in systems with radioactive sodium, 14 were accompanied by burning of sodium, and five were caused by improper maintenance or repair operations or by the unit input/output operations.
The most serious incidents at the Beloyarsk NPP:
• From 1964 to 1979 disintegration of fuel assemblies repeatedly occurred in the first unit core. In 1977, a half of fuel assemblies melted down in the second unit core. Repairs took about a year. December 31, 1978, a fire occurred at the second unit. The fire was caused by the floor slab in the machine room falling on the turbo-generator oil tank. The entire control cable burned out. The reactor was left without control systems. Eight people got irradiated during emergency cooling water supply operations.
• January 21, 1987, accident occurred at the BN-600 reactor: in result of exceeding the permissible operating temperature in the reactor core a massive break of fuel elements hermeticity happened. This led to the release of radioactivity with total activity of about 100 thousand Ci. By all its characteristics it was a 4 level accident by the INES.
• In August 1992, the expedition of the State Chernobyl Committee of Russia in the Beloyarsk NPP area found anomalous concentration of cesium-137 and cobalt-60. Maximum radiation was registered at about 1200 mcR/h and formed mainly by radiation of cobalt-60.
• December 22, 1992, due to personal negligence of staff a liquid radioactive waste storage pumps service room was flooded. Water reached soil under the storage, and then, by special drainage network, the cooling pond. Total amount of liquid radioactive waste leaked was about 15 m3 with total activity of 6 Ku. The total activity of cesium-137 entered the cooling pond, about 6 mKu. This incident was assigned to the 3rd level on the INES.
• January 29, 1993, due to the increased number of failures in the technological process at the Beloyarsk NPP the sanitary-protective zone of the plant was expanded. Its radius has grown from 8 to 30 kilometers and became equal to the size of the Chernobyl zone.
• October 7, 1993, at 11:19 am, the third unit of Beloyarsk NPP was stopped on the grounds of the increased radiation background in the ventilation system. The reason was a coolant leak in one of the auxiliary systems. Also, according to director of the plant, there was a small fire. The incident was rated a 1st level on the INES.
• June 6, 1994, during the major repair non-radioactive sodium leaked from the second circuit, causing the fire. The plant personnel was unable to manage the situation on its own and called 15 the fire brigade. The brigade also did not have means extinguish sodium. Once the leak was stopped the released sodium burned out, and the fire stopped by itself.
• In 1995, radiation levels in groundwater under the liquid radioactive waste storage was found to exceed the allowable concentrations of cesium-137 by 1.2-4.4 times and of strontium-90 by 1.8 -11.5 times at the Beloyarsk NPP.
• June 9, 1999, one of the three turbo-generators was shut down because of the risk of ignition of the turbine. There was an alarm system signal. Two other generators were shut down automatically.
• September 9, 2000, due to personnel errors an accident occurred in the Sverdlovenergo power grid that supplies the plant with electricity the station. In result the Beloyarsk nuclear power plant was disconnected from the power supply. 3 seconds later the BN-600 reactor was shut down by emergency system. As a result, the plant’s capacity reduced to 0. The station was deenergized for 9 minutes. Emergency situation of this kind is not described in the special instructions. According to independent experts, the BNPP was only a few minutes away from a disaster comparable with Chernobyl .
• July 9, 2007, one of the three BNPP power generators was cut off in result of a lightning hit to the overhead power line.
• In June 2008, due to some faults of one of the main circulating pump system the reactor capacity was reduced from 600 to 400 MW. In result, one of loops in which the coolant circulates was automatically shut down.