$this->bbcode_second_pass_quote('', '')As we add more and more wind power, the grid will get more stressed, and there’s going to be a point where the grid can’t handle any more,” Wellinghoff said at an energy conference in Chicago. “The first thing we need is to build out transmission.”
The country’s electricity network sprawls over 211,000 miles (340,000 kilometers) of high-voltage power lines, a patchwork connecting substations and transformers owned by utilities and federal agencies.
Obama’s $787 billion stimulus plan to end the deepest U.S. recession since the 1940s dedicates $6 billion in the next two years to expand the country’s transmission system for renewable energy. By contrast, China is spending 23 percent of its 4 trillion yuan ($585 billion) in stimulus to make its grid ready for alternative sources, using advanced electrical technologies from Zurich-based ABB Ltd. and American Superconductor Corp.



But the electricity distribution problem is one that I have heard from clients over the last four years, so had a gut reaction in responding too. ![adios [smilie=adios.gif]](https://udev.peakoil.com/forums/images/smilies/adios.gif)