Hi ROCKMAN, Yes I think there is considerable potential for exploitation of low temp geothermal resources in Georgia. I think I mentioned in my first post in this thread this potential. I'm sure that commercial ops are looking into this as you say. They will know who to contact for professional advice. In case somebody from that state views this, I could suggest the
IGSHPA as an initial port of call.
Here is some news for conventional geothermal (and possibly GHP construction too) in USA:
Good News From the IRS on the PTC for Wind and Geothermal$this->bbcode_second_pass_quote('', 'S')ome good news from the IRS on April 15.
A newly issued definition from the IRS has removed the last element of uncertainty attached to the extension of the production tax credit (PTC). The PTC is crucial to the wind and geothermal industries.
The IRS definition of "under construction" was necessary because an extension of the credit passed on January 1, 2013 replaced language in the previous tax credit provision that required projects to be in production by the deadline to earn the credit. The new language allows the tax credit to apply to projects that are under construction by its expiration.
The new language was intended to compensate for the fact that lawmakers did not provide ongoing support to developers earlier in 2012. The uncertainty produced by that led to an abnormal shift in the wind business. Developers put their full effort into getting projects into production in time to qualify for the credit and virtually ignored planning and investment for 2013.
The result was record-breaking installations in 4Q 2012 and virtually no orders for 1H 2013.
Most wind industry forecasters expect orders to pick up now that the final element of uncertainty has been eliminated, but because large wind equipment manufacturing requires a long lead time, forecasters do not expect development to pick up until 2H 2013. The new under-construction provision should, however, drive development activity well into 2014.
According to IRS Notice 2013-29, released on April 15, wind, geothermal, biomass, landfill gas, incremental hydroelectric and ocean energy projects that meet one of two under-construction standards by December 31 of this year will qualify to either get: 1) a tax credit of $0.023 for every kilowatt-hour produced for the first ten years of the project’s life, or 2) an investment tax credit equal to 30 percent of the project’s cost when construction is completed.
To meet the "under construction" qualification, developers must either: 1) show “physical work of a significant nature” has begun on their project, either a) at the site, or b) in a factory to which the developer has given a binding order for specially designed equipment, or 2) show that at least 5 percent of the total project cost has been incurred.
There is no completion deadline for projects that meet the "under construction" standards by December 31.