Page added on April 1, 2006
Fuji Heavy Industries Ltd., the parent company of Subaru, announced that it has been testing its newly-developed two-megawatt wind generation system since the beginning of 2006. The prototype of the system, called Subaru 80/2.0, is at Hasaki, Kamisu City, Ibaraki Prefecture, facing the Pacific Ocean.
The three-bladed wind turbine has a controllable pitch and is 62 meters in height from the ground to the rotor hub. The rotor, which has a diameter of 80 meters, can generate electricity at a wind velocity as low as three meters per second
greencarcongress
Leave a Reply